GDT Event 136 – 17 March
The next GDT auction sees 10,075 tonnes of WMP offered by Fonterra. This is 16% less than was available at the previous auction but is 5% more than previously forecast. An extra 475 tonne (11%) of WMP has been added to Contract 2 for the 17 March auction.
Butter volumes have been revised up by 50 tonnes from the previous forecast while SMP and AMF volumes remain as forecast.